Customer: Land Transport Authority

Location: Singapore

Contract: Design & Build

Target Completion: between 2028 and 2029

 

Transport Solutions South East Asia

 

This project (Contract J108) is part of the new Jurong Region Line MRT development and consists of three elevated stations at Tengah Plantation, Tengah Park and Bukit Batok West. The stations are linked by 2.3 km of segmental precast twin track viaducts. 

The viaduct comprises of post tensioned precast segments that will be erected using a combination of launching girders and lifting frames. The project includes a stretch of viaduct erected within meters of multistorey residential towers and a long span crossing of Bukit Batok Road. 

The 150 m long station platforms will be accessed through station entrance structures which include three long span link bridges over key arterial roads and the Pan Island Expressway. 

The 24-kilometre long Jurong Region Line (JRL) will add 24 stations to the existing Singapore rail network to serve residents of Choa Chu Kang, Boon Lay, Jurong and future developments in the Tengah area. Opening in stages between 2028 and 2029, the JRL development will provide key transport links to the Jurong Industrial Estate, Jurong Innovation District, and the Nanyang Technological University (NTU) in western Singapore. 