Customer: Thai Oil Company Limited Contract: EPC Location: Thailand |
Fast Facts
|
We used our industry-leading marine capability in the design, construction and commissioning of this new raw water pump station for the Thai Oil Company. The new pump station was part of their New Bang Phra Raw Water Line project in Thailand.
The new pump station provides over 4,000 m3/h of raw water and replaced an existing system, which was insufficient due to its low capacity pumps, pipe leakage and corrosion.
The multidisciplinary nature of the project, which included the construction of a temporary cofferdam (20m x 20m and approximately 10m deep), allowed us to differentiate ourselves from our competitors, bringing together our deep marine knowledge and experience from across the Group.
We completed all system testing and commissioning, and handed over the completed facility to our customer on time. Most importantly, the project was delivered without a lost time injury.
The project was located at Bang Phra Reservoir, Chonburi, Thailand, which is approximately 16 km from the Thai Oil Public Company Limited (TOP) Refinery in Sriracha. There, our team successfully completed the IDEA Project, which involved the construction of 4 km of 36” HDPE pipeline.