We just completed one of the most sustainable transport projects in Melbourne!
In Alliance with Level Crossing Removal Project (government), MTM (network operator), and Arup and Mott MacDonald (design partners), we removed the level crossing at Mt Derrimut Road and opened the new Deer Park Station in Melbourne's west - easing congestion, improving safety and caring for the environment while we did it.
Check out these impressive numbers from the project:
♻️ 125,000 pieces of recycled soft plastic used in construction materials.
♻️ 80% of construction waste processed with an industrial recycler for reuse.
♻️ Enough solar power generated to power the equivalent of 10 homes.
♻️ 44% of the project is covered by vegetation – including 2 rooftop gardens.