Project SH1/16 Waterview Connection Temporary Works Temporary structures included a platform to support a 650 tonne crane weighting 1,200 tonne that was positioned on top of a deep-piled excavation. The platform required deeper and longer piles than any of the permanent structures and included 400 multi-strand ground anchors. Our team built all the temporary works required for the crane to set-up and TBM (named Alice) set-up to construct the tunnels. Pictured below are steel temporary works.