Our Mechanical Division Experienced local team with a proven track record McConnell Dowell’s Mechanical Division has been operating in New Zealand for more than 30 years. The Division was born out of our focus on delivering complex projects requiring significant mechanical capability. We have delivered some of New Zealand’s most significant mechanical projects in recent years such as the SH1/16 Waterview Connection, the largest geothermal power station at Te Mihi, and the largest wastewater treatment plant upgrades at the Māngere WWTP and Pukekohe WWTP. In all cases, we have achieved industry leading results in safety performance, quality, and client satisfaction. We have a loyal, local and highly experienced workforce that is available to undertake this complex mechanical work. TBM assembly and disassembly McConnell Dowell has a strong track record in the delivery of tunnelling projects, as the only in-country contractor to have direct experience of assembling and dismantling large tunnel boring machines. In addition, we enjoy a strong relationship with Herrenknecht due to our other ongoing tunnelling projects across New Zealand. Temporary works We have an in-house Engineering Team that led the SH1/16 Waterview Connection temporary works. The team also undertakes the temporary works design for all our projects and provides support to the Mechanical Division for larger packages of work. The Mechanical Division also fabricated, assembled and installed all form work for the ‘cut and cover’ trench works on City Rail Link C2. Steel fabrication We have a wide range of steel fabrication services from structural steelwork, fuel, water, and wastewater tanks, conveyors, high pressure pipework, stainless steel, and custom lifting devices. In this brochure, we highlight our multidisciplinary capabilities and a small selection of case studies that demonstrates our experience delivering mechanical projects relevant to Project Electron. We would be pleased to provide further details on request. SH1/16 Waterview Connection New Zealand Hunua 4 Section 11 New Zealand Core services highlighted in this brochure: • Temporary Works • Equipment Refurbishment • Maintenance & Shut-down Support • Pipe Spooling Projects include: Scan here to learn more about our Mechanical Division
RkJQdWJsaXNoZXIy Mjk0NTM=